To Do List

It’s been a long while since I’ve last updated my to do list, so here goes…

Those items highlighted green are those that have been completed since I last updated the list (June 2010)

To Do List

1)  Replace carpet with wood

2) Replace existing tile

3)  Replace all light fixtures

  • Entry – pendant
  • Dining – pendant
  • Living Room – recessed
  • Kitchen – pendant
  • Master Bedroom – pendant/close to ceiling
  • Master Bathroom – pendant or sconces
  • Bedrooms – close to ceiling
  • Guest Bathroom – sconce
  • Exterior Front – sconce

4)  Demolish partial wall/cover existing opening

5)  Replace Living Room doors with windows  (I haven’t decided if I still want to do this.  Originally, I thought the door was inoperable, but the wood had just swelled the door closed.)

6)  Replace window treatments (I’m about halfway through with this one, not enough to cross it off, unfortunately.)

7)  Remove upper cabinets above peninsula in kitchen

8 ) Paint Fireplace

9)  Add Fireplace doors (crossing both 8 and 9 off my list because I’m fairly certain I’ve changed my mind about both items)

10)  Add pocket/barn door to Master Bathroom

11)  Replace Master Bathroom sink

12)  Replace toilets with dual flush toilets

13)  Paint Interior (I decided to paint the kitchen the same color as the living room and to paint the cabinets. I may treat the laundry room completely different from the rest of the house since that room is so dark and depressing.)

  • Living Room/Dining Room/ Hallway/ Kitchen – SW Pearly White
  • Kitchen Cabinets – White (which white, I don’t know.)
  • Laundry Room – ???
  • Office – SW Pearly White
  • Guest Bathroom – SW Worldly Gray
  • Master Bedroom/Master Bathroom – SW Balanced Beige

14)  Paint Exterior (In progress, yes, still.)

  • Trim – SW Black Fox
  • Field – SW Universal Khaki

15)  Replace Kitchen counter with quartz or butcher block

16)  Replace all windows (4 out of 10 of these will be replaced this year!)

I’m hoping this will be inspiring to those who feel they need to tackle everything at once. We have actually made great progress here in under 3 years, but I try not to rush myself. I’ve learned that my ideas change with time (see items 8 and 9) and almost always for the better. If I had tried to tackle my whole To Do List at one time, I would not be as happy with the (in progress) outcome as I am!

Enjoy it!

Advertisements

One Comment to “To Do List”

  1. You’ve nailed the secret to life itself, including remodeling.

    So many people get overwhelmed by the enormity of things,
    then get stuck and never make any real progress (in life).

    The key is exactly what you do here:

    Break down the overall project into specific goals and tasks.
    Stay flexible on timing and approach — change ideas when useful.
    Chart your progress and document the improvements.
    Remind yourself to stay flexible on the timing (see above).

    Brilliant post and we also like your work and your gifts for design.
    Can’t wait to tour the project again soon! 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: